FREE: Talk to our live AI audit agent.
SYSTEMS
All workflows
Product & engineering·Big bet

Close every product experiment with a decision record

Every experiment records hypothesis, guardrails, result, confidence, segment limits, and the resulting decision.

The problem

Experiments end with a chart but no durable decision, limitation, or follow-up.

What you get

A working system with the steps, tools, checkpoints, and expected return made explicit.

Setup
75 minutes
Back each week
3 hours
Difficulty
assisted

Expected return

The working case

A planning estimate, not a guaranteed result. Measure the first four weeks against your own baseline.

144

hours returned per year

At 3 hours/week across 48 working weeks.

1

week to earn back setup

Compare the setup estimate with the weekly time returned.

Operating contract

Input

The source material, constraints, and examples a human would need to do this work well.

Checkpoint

A person reviews judgment calls, sensitive content, unfamiliar tools, and irreversible actions.

Success signal

Track time returned, corrections required, and exceptions. Keep it only if the measured result compounds.

Before you start

The steps

  1. 01

    Name product analytics lead as the accountable owner and define the decision this workflow is allowed to support.

  2. 02

    Collect experiment plan, exposure data, metric results, and analyst notes; preserve source links, timestamps, and access controls before any synthesis.

  3. 03

    Produce a durable experiment decision record using the approved template. Do not call significance or causality beyond the approved analysis.

    Copy this prompt

    Create a durable experiment decision record from the supplied evidence. Separate facts, assumptions, and missing inputs. Cite every material claim. Do not call significance or causality beyond the approved analysis. Evidence: [approved inputs]

  4. 04

    product analytics lead reviews the draft, records the decision or next action, and corrects the source system before distribution.

What it runs on

Where this goes wrong

Definition of done

Run it for four weeks. Then make it earn its place.

Build the system around it

Related workflows

If this one stops working, tell us. Three reports in a month and it leaves the library until a person has looked at it again.